[7:06 ; I arrive at work] J already is here
[7:25 ; start Job 1]
? -8:19 ; wandering - NOTE 1
8:19-8:36 ; phone
8:39-8:43 ; wandering
[9:00 ; start Job 2]
9:30- ? ; phone
[9:32-9:51 ; I am I am not in area to observe]
? -10:16 ; wandering
10:16-10:30ish ; sitting/phone
+10:49-10:52 ; wandering/phone
10:56-11:06 ; wandering
[11:20-11:44 ; lunch, I am not in area to observe]
12ish-12:36 ; gratuitous forklifting, see NOTE 2
12:36-12:50ish ; wandering
1:00ish-1:16 ; wandering
1:25ish-2:17 ; wandering
+3:08-3:20ish ; wandering
3:30ish- ? ; wandering
[3:43 ; I leave the building]
If the terms used seem confusing, you might read this.
NOTE 1: J has been outside with a toolbox, presumably doing something with his car, have no idea how long as I wasnt paying attention at the time.
NOTE 2: This is the only "work" J does between noon-ish and 2:15ish. J really likes to drive the forklift. Fast. Never mind that there is non-forklifting work for him that needs to be done. Never mind that there are people who get paid to forklift. Never mind that much of the forklifting he does is utterly unnecessary.