Wednesday, July 11, 2012

July 11, 2012 - J

[7:11 ; arrive, begin observations]
7:36 ; wandering
7:47 ; phone
+8:11-8:12 ; wandering
8:12-8:35 ; sitting
8:40-8:48 ; phone
8:53-8:56+ ; phone
NOTE 1
9:07-9:10 ; phone
(9:11-9:15 ; MW)
9:23-9:29 ; wandering
(9:26-9:27 ; MW)
9:32-9:34 ; sitting
+10:05-10:20 ; wandering
10:50-10:54 ; phone
+11:10-11:58 ; wandering
[11:17-11:53 ; lunch, not in the department to observe]
11:58-12:15 ; wandering
[12:25-12:30 ; bathroom, not in the department to observe]
(12:36-12:42 ; MW)
12:42-12:50 ; yakking
12:58-1:01 ; wandering
(1:03-1:10 ; MW)
1:18-1:20 ; rapping
NOTE 2
1:21-1:33 ; sitting
1:34-1:40 ; phone
1:51 ; phone
2:04-2:15 ; wandering
2:22-2:26 ; phone
(2:27 ; MW)
2:35-2:50 ; wandering
NOTE 3
2:50-2:56 ; sitting
(2:57-3:00 ; HK)
2:59-3:00 ; phone)
3:01-3:16 ; wandering
3:33-3:45 ; sitting
3:45-3:53 ; yakking
3:55-4:02 ; wandering
[4:09 ; I leave, end of observation]


NOTE 1: J had a malfunction with a part of the machine he operates, so he called maintenance. Then, rather than do a job that didnt require that part, or borrow an identical part from another machine, he waited, doing nothing.

NOTE 2: Another malfunction. Also sitting and waiting. Am beginning to suspect something rather like Munchhausen-By-Proxy Syndrome.

NOTE 3: Repeatedly finishes a small part of his order, then sits down and carefully counts it, which would be (and probably is) unnecessary if one does the job correctly.



If the terms used seem confusing, you might read this.

No comments:

Post a Comment